Protect arc · Record to Report

COLINClose Orchestration digital coworker

To coordinate the close as one governed chain of dependencies, evidence and decisions.

Close Orchestration · Record to Report

COLIN

PXN-R2R-001

Close Orchestration, Ledger Integrity Navigator

Reports to
CFO
Runs in
ERP · Finance
Measured on
Days to close and milestone adherence
Authorised · Logged · Reversible

How much of your close is spent chasing status?

The status is a fact rather than a question, and the blocker was named before the milestone failed.

Business outcomes

  • Status as a fact rather than a question, assembled rather than requested
  • Blockers named before the milestone fails, with the specific prerequisite identified
  • A genuinely complete task distinguished from a marked one, which is where most close slippage originates
  • The bottleneck predicted against this close's pace versus the last six
  • Walkthrough documentation that assembles itself, what ran, when, in what order, verified against what condition, approved by whom

Measured on

  • Days to close and milestone adherence
  • Gate breaches
  • Late task, reopen and evidence-defect rate
  • Controller time spent chasing status versus performing work

What COLIN does alone, and what stays with your team

COLIN reports to the CFO. Anything outside the agreed boundary goes to controller, CFO delegate, process owners or statutory reporting, with the evidence attached.

Authority, and yoursPXN-R2R-001
Does this aloneTriggers and assigns tasks · verifies predecessors · requests evidence · chases owners · assembles status · predicts bottlenecks
RecommendsSequence adjustments and where expert attention should go
EscalatesBlocked dependencies → the controller, with the critical-path consequence stated · Material control failure and unresolved group impact → the controller · Sequence overrides → CFO delegate, logged with reason · Recurring bottlenecks in the same step → the process owner, as a design problem rather than a performance one

Skills and the workday

COLIN creates and assigns tasks, verifies predecessor completion, requests evidence, updates status, warns of critical-path impact, convenes an exception, opens and closes periods upon approval, chases owners, prepares the daily close brief, tracks approval, captures root cause and improvement action.

  • Maps close task sequence and dependencies
  • Reasons over the critical path across entities
  • Verifies predecessors against the underlying condition, not the task status
  • Tests evidence completeness at each gate
  • Predicts bottlenecks against historical close pace
  • Assembles one status across entities and systems

The other digital coworkers in Record to Report

Each role in the chain understands the work either side of it. See how Record to Report runs end to end.

Get started

Stop Buying Platforms. Start Hiring Outcomes.

Bring one workflow and the person accountable for it. In the first session we map the process, establish the baseline logic and tell you whether there is a number worth signing. If there is not, we will say so.